91久久国产综合精品女同我,国产激情一区二区三区在线观看,国产精品国产三级国产试看

hotline:(86)755-29706681 29706682

Latest News

Sealing machine precautions.

                                                                                       Sealing machine precautions.

1. It is not suitable for metal containers and metal covers. It is not allowed to press the start button on the metal table, otherwise it will damage the machine.

2. Insert the induction air plug and tighten the screw before turning on the power.

3. Use single-phase three-wire power cord. For operator safety, be sure to use single-phase three-wire power socket. The work floor must be dry to keep insulation.

4, with temperature overheating automatic protection function, when the internal temperature of the machine is overheated, the buzzer sounds in the machine ” abnormal protection (PRO. MD.)” yellow indicator light, at this time should turn off the main power switch, standby cooling After the buzzer stops, continue working.

5. During the working process, always touch the surface of the sensor head to check whether it is overheated. If it is found that the hot hand should stop heating, it should work after cooling (cooling can not turn off the power), when the “WARM UP” green indicator light is off, Do not press the start button to avoid false triggering. When the unit is finished, turn off the power switch on the panel.

6, equipped with a fuse of 5A, not available for greater than 5A insurance instead.

7. There is high voltage inside, the bottom plate is charged, and it is strictly forbidden to repair it personally to avoid personal electric shock.

8. If it is found that there is a bare wire before use, stop using the machine and use it after repair.

9. The equipment should not be impacted, stressed or damp when transported, stored or used.

10. When the product is inspected and checked out, in the case of normal transportation and good packaging, if the parts of the product are found to be inconsistent with the packing list, the company should be contacted in time. 11. According to the instruction manual, the operation should be clearly understood in advance. If the quality of the product is found, the company will be explained to the company within the prescribed time limit. The equipment is guaranteed for half a year and is responsible for maintenance.

        1. <strike id="rl7z2"></strike>

          <strike id="rl7z2"></strike>
          主站蜘蛛池模板: 大悟县| 菏泽市| 韩城市| 安义县| 滨海县| 子长县| 兴宁市| 临城县| 明溪县| 南康市| 呈贡县| 泊头市| 南皮县| 深圳市| 舒兰市| 武定县| 嘉禾县| 西城区| 兰考县| 增城市| 博湖县| 高台县| 化德县| 中江县| 民乐县| 金华市| 开江县| 图片| 鹤庆县| 蓬安县| 蒙阴县| 垫江县| 威远县| 德化县| 西乌珠穆沁旗| 伊宁县| 鹤壁市| 伊通| 漳州市| 聂荣县| 宁河县|